Diez Mediavilla, Montserrat
Dieste Velasco, Mª Isabel
Rodríguez Amigo, María del Carmen
Garcia Calderon, Teofilo
Alonso Tristán, Cristina
2014-10
Two complete years of operation of two grid-tied PV facilities is presented. Energetic and economic performance of both installations has been compared. Located in the same place, the installation of these facilities followed the same construction criteria – PV panels, panel support system and wiring – and the facilities are exposed to the same atmospheric temperature and solar radiation. They differ with regard to their inverter topology used: one facility uses a central inverter and the other a string inverter configuration. The performance of the facilities has been determined using a procedure based on a small number of easily obtained parameters and the knowledge of the analyzed system and its operation mode. Electrical losses have been calculated for both systems and a complete comparison between them has been carried out. The results have shown better performance for distributed system in economic and energetic terms.
application/pdf
http://hdl.handle.net/10259/4696
eng
Elsevier
Performance of grid-tied PV facilities based on real data in Spain: Central inverter versus string system
info:eu-repo/semantics/article