Universidad de Burgos RIUBU Principal Default Universidad de Burgos RIUBU Principal Default
  • español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
Universidad de Burgos RIUBU Principal Default
  • Ayuda
  • Contactez-nous
  • Faire parvenir un commentaire
  • Acceso abierto
    • Archivar en RIUBU
    • Acuerdos editoriales para la publicación en acceso abierto
    • Controla tus derechos, facilita el acceso abierto
    • Sobre el acceso abierto y la UBU
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Parcourir

    Tout RIUBUCommunautés & CollectionsPar date de publicationAuteursTitresSujetsCette collectionPar date de publicationAuteursTitresSujets

    Mon compte

    Ouvrir une sessionS'inscrire

    Statistiques

    Statistiques d'usage de visualisation

    Compartir

    Voir le document 
    •   Accueil de RIUBU
    • E-Prints
    • Untitled
    • Untitled
    • Artículos SWIFT
    • Voir le document
    •   Accueil de RIUBU
    • E-Prints
    • Untitled
    • Untitled
    • Artículos SWIFT
    • Voir le document

    Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10259/4696

    Título
    Performance of grid-tied PV facilities based on real data in Spain: Central inverter versus string system
    Autor
    Diez Mediavilla, MontserratAutoridad UBU Orcid
    Dieste Velasco, Mª IsabelAutoridad UBU Orcid
    Rodríguez Amigo, María del CarmenAutoridad UBU Orcid
    García Calderón, TeófiloAutoridad UBU Orcid
    Alonso Tristán, CristinaAutoridad UBU Orcid
    Publicado en
    Energy Conversion and Management. 2014, V. 86, p. 1128-1133
    Editorial
    Elsevier
    Fecha de publicación
    2014-10
    ISSN
    0196-8904
    DOI
    10.1016/j.enconman.2014.06.087
    Résumé
    Two complete years of operation of two grid-tied PV facilities is presented. Energetic and economic performance of both installations has been compared. Located in the same place, the installation of these facilities followed the same construction criteria – PV panels, panel support system and wiring – and the facilities are exposed to the same atmospheric temperature and solar radiation. They differ with regard to their inverter topology used: one facility uses a central inverter and the other a string inverter configuration. The performance of the facilities has been determined using a procedure based on a small number of easily obtained parameters and the knowledge of the analyzed system and its operation mode. Electrical losses have been calculated for both systems and a complete comparison between them has been carried out. The results have shown better performance for distributed system in economic and energetic terms.
    Palabras clave
    Inverter layout
    PV system
    Performance
    Grid-connected system
    Materia
    Electrical engineering
    Electrotecnia
    URI
    http://hdl.handle.net/10259/4696
    Versión del editor
    https://doi.org/10.1016/j.enconman.2014.06.087
    Aparece en las colecciones
    • Artículos SWIFT
    Attribution-NonCommercial-NoDerivatives 4.0 International
    Documento(s) sujeto(s) a una licencia Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
    Fichier(s) constituant ce document
    Nombre:
    Diez-ECM_2014.pdf
    Tamaño:
    1.142Mo
    Formato:
    Adobe PDF
    Thumbnail
    Voir/Ouvrir

    Métricas

    Citas

    Academic Search
    Ver estadísticas de uso

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis
    Afficher la notice complète