Universidad de Burgos RIUBU Principal Default Universidad de Burgos RIUBU Principal Default
  • español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
Universidad de Burgos RIUBU Principal Default
  • Ayuda
  • Fale conosco
  • Entre em contato
  • Acceso abierto
    • Archivar en RIUBU
    • Acuerdos editoriales para la publicación en acceso abierto
    • Controla tus derechos, facilita el acceso abierto
    • Sobre el acceso abierto y la UBU
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosEsta coleçãoPor data do documentoAutoresTítulosAssuntos

    Minha conta

    EntrarCadastro

    Estatísticas

    Ver as estatísticas de uso

    Compartir

    Ver item 
    •   Página inicial
    • E-Prints
    • Untitled
    • Untitled
    • Ver item
    •   Página inicial
    • E-Prints
    • Untitled
    • Untitled
    • Ver item

    Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10259/6910

    Título
    Analysis of the technical and operational capacity of a combined semi-trailer rail transport service between the port of Algeciras and Zaragoza.
    Autor
    Escobar de la Iglesia, Jaime
    Larrodé Pellicer, Emilio
    Publicado en
    R-Evolucionando el transporte
    Editorial
    Universidad de Burgos. Servicio de Publicaciones e Imagen Institucional
    Fecha de publicación
    2021-07
    ISBN
    978-84-18465-12-3
    DOI
    10.36443/10259/6910
    Descripción
    Trabajo presentado en: R-Evolucionando el transporte, XIV Congreso de Ingeniería del Transporte (CIT 2021), realizado en modalidad online los días 6, 7 y 8 de julio de 2021, organizado por la Universidad de Burgos
    Resumo
    The aim of this study is to evaluate the feasibility to run an Autopista Ferroviaria with Iberian width from a technical and operational point of view in order to analyse the business model in the short term. A.F. (Autopista Ferroviaria) is defined by the Spanish Public Works Department as a combined transport in which semitrailers are transported by train in a shuttle service using specific wagons and terminals conditioning for this service according with the chosen operational typology. According to this definition, Spain, for the moment, still has not a service that could be called A.F. in Iberian width. This study is based on the current Iberian railway line between the Port of Algeciras and Plaza (Logistic Platform of Zaragoza) and its focus is to determine whether from a technical and operational point of view, this rail line provides enough features to be used as A.F. To reach this goal, a European Ten-T corridor, the Atlantic one, and two important connections which are included in the Core Networks: Algeciras and Zaragoza are considered.
    Palabras clave
    Logística
    Logistics
    Operaciones
    Operations
    Transporte de mercancías
    Transportation of goods
    Ferrocarriles
    Railroads
    Materia
    Ingeniería civil
    Civil engineering
    Transportes
    Transportation
    URI
    http://hdl.handle.net/10259/6910
    Versión del editor
    https://doi.org/10.36443/9788418465123
    Relacionado con
    http://hdl.handle.net/10259/6490
    Aparece en las colecciones
    • Untitled
    Arquivos deste item
    Nombre:
    Escobar_CIT2021_1075-1083.pdf
    Tamaño:
    370.3Kb
    Formato:
    Adobe PDF
    Thumbnail
    Visualizar/Abrir

    Métricas

    Citas

    Ver estadísticas de uso

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis
    Mostrar registro completo

    Universidad de Burgos

    Powered by MIT's. DSpace software, Version 5.10