Universidad de Burgos RIUBU Principal Default Universidad de Burgos RIUBU Principal Default
  • español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
Universidad de Burgos RIUBU Principal Default
  • Ayuda
  • Contactez-nous
  • Faire parvenir un commentaire
  • Acceso abierto
    • Archivar en RIUBU
    • Acuerdos editoriales para la publicación en acceso abierto
    • Controla tus derechos, facilita el acceso abierto
    • Sobre el acceso abierto y la UBU
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Parcourir

    Tout RIUBUCommunautés & CollectionsPar date de publicationAuteursTitresSujetsCette collectionPar date de publicationAuteursTitresSujets

    Mon compte

    Ouvrir une sessionS'inscrire

    Statistiques

    Statistiques d'usage de visualisation

    Compartir

    Voir le document 
    •   Accueil de RIUBU
    • E-Prints
    • Untitled
    • Untitled
    • Artículos SWIFT
    • Voir le document
    •   Accueil de RIUBU
    • E-Prints
    • Untitled
    • Untitled
    • Artículos SWIFT
    • Voir le document

    Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10259/4702

    Título
    Thermal balance of wet-steam turbines in nuclear power plants: a case study
    Autor
    Álvarez Fernández, MarioAutoridad UBU
    Portillo Valdés, Luis del .
    Alonso Tristán, CristinaAutoridad UBU Orcid
    Publicado en
    Applied Thermal Engineering. 2016, V. 93, p. 598-605
    Editorial
    Elsevier
    Fecha de publicación
    2016-01
    ISSN
    1359-4311
    DOI
    10.1016/j.applthermaleng.2015.09.051
    Résumé
    Conventional methodology is applied in this study to estimate the efficiency of nuclear power generation and the electrical power that is generated at a nuclear plant built in the nineteen-sixties. A simulation of the whole power plant is conducted with this methodology. The characteristic parameters from the study are compared with those estimated by the manufacturer for its on-design operation mode. Furthermore, the model calculates the anticipated pressures, temperatures, mass flows and electrical power on the basis of the data from various performance tests. These estimated parameters are then compared with real values measured in the plant. The objective of the present paper is to study whether the conventional approach is acceptable for the simulation of the parameters of the power station, and to identify areas where the results of the simulation may be improved, in order to minimize the deviations between the simulated parameters and the actual measurements.
    Palabras clave
    Nuclear power plant
    Wet-steam turbine
    Balance of plant
    Materia
    Ingeniería nuclear
    Nuclear engineering
    Ingeniería eléctrica
    Electric engineering
    URI
    http://hdl.handle.net/10259/4702
    Versión del editor
    https://doi.org/10.1016/j.applthermaleng.2015.09.051
    Aparece en las colecciones
    • Artículos SWIFT
    Attribution-NonCommercial-NoDerivatives 4.0 International
    Documento(s) sujeto(s) a una licencia Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
    Fichier(s) constituant ce document
    Nombre:
    Álvarez-ATE_2016.pdf
    Tamaño:
    822.6Ko
    Formato:
    Adobe PDF
    Thumbnail
    Voir/Ouvrir

    Métricas

    Citas

    Academic Search
    Ver estadísticas de uso

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis
    Afficher la notice complète