Universidad de Burgos RIUBU Principal Default Universidad de Burgos RIUBU Principal Default
  • español
  • English
  • français
  • Deutsch
  • português (Brasil)
  • italiano
Universidad de Burgos RIUBU Principal Default
  • Ayuda
  • Contacto
  • Sugerencias
  • Acceso abierto
    • Archivar en RIUBU
    • Acuerdos editoriales para la publicación en acceso abierto
    • Controla tus derechos, facilita el acceso abierto
    • Sobre el acceso abierto y la UBU
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    • español
    • English
    • français
    • Deutsch
    • português (Brasil)
    • italiano
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Listar

    Todo RIUBUComunidadesFechaAutor / DirectorTítuloMateria / AsignaturaEsta colecciónFechaAutor / DirectorTítuloMateria / Asignatura

    Mi cuenta

    AccederRegistro

    Estadísticas

    Ver Estadísticas de uso

    Compartir

    Ver ítem 
    •   RIUBU Principal
    • E-Prints y Datos de investigación
    • Grupos de investigación
    • Solar and Wind Feasibility Technologies (SWIFT)
    • Artículos SWIFT
    • Ver ítem
    •   RIUBU Principal
    • E-Prints y Datos de investigación
    • Grupos de investigación
    • Solar and Wind Feasibility Technologies (SWIFT)
    • Artículos SWIFT
    • Ver ítem

    Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/10259/4754

    Título
    Implementation of PV plants in Spain: a case study
    Autor
    Diez Mediavilla, MontserratAutoridad UBU Orcid
    Alonso Tristán, CristinaAutoridad UBU Orcid
    Rodríguez Amigo, María del CarmenAutoridad UBU Orcid
    García Calderón, TeófiloAutoridad UBU Orcid
    Publicado en
    Renewable and Sustainable Energy Reviews. 2010, V. 14, n. 4, p. 1342-1346
    Editorial
    Elsevier
    Fecha de publicación
    2010-05
    ISSN
    1364-0321
    DOI
    10.1016/j.rser.2009.12.010
    Resumen
    The implementation process of a photovoltaic system and its connection to the national grid in Spain is examined from an economic, an administrative and a legal standpoint. In the first place, this case study describes the solar farm, and it goes on to examine the economic aspects of electricity production, its associated costs, and relevant grants and financial subsidies. Finally, problems related to the administration of the project and the issuing of permits by local and regional authorities are discussed.
    Palabras clave
    PV grid-connected systems
    PV production
    PV support
    Administrative process
    Materia
    Electrical engineering
    Electrotecnia
    URI
    http://hdl.handle.net/10259/4754
    Versión del editor
    https://doi.org/10.1016/j.rser.2009.12.010
    Aparece en las colecciones
    • Artículos SWIFT
    Attribution-NonCommercial-NoDerivatives 4.0 International
    Documento(s) sujeto(s) a una licencia Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
    Ficheros en este ítem
    Nombre:
    Diez-RSER_2010.pdf
    Tamaño:
    640.7Kb
    Formato:
    Adobe PDF
    Thumbnail
    Visualizar/Abrir

    Métricas

    Citas

    Academic Search
    Ver estadísticas de uso

    Exportar

    RISMendeleyRefworksZotero
    • edm
    • marc
    • xoai
    • qdc
    • ore
    • ese
    • dim
    • uketd_dc
    • oai_dc
    • etdms
    • rdf
    • mods
    • mets
    • didl
    • premis
    Mostrar el registro completo del ítem