Mostrar el registro sencillo del ítem
dc.contributor.author | Diez Mediavilla, Montserrat | |
dc.contributor.author | Dieste Velasco, Mª Isabel | |
dc.contributor.author | Rodríguez Amigo, María del Carmen | |
dc.contributor.author | García Calderón, Teófilo | |
dc.contributor.author | Alonso Tristán, Cristina | |
dc.date.accessioned | 2018-01-11T09:13:46Z | |
dc.date.available | 2018-01-11T09:13:46Z | |
dc.date.issued | 2014-10 | |
dc.identifier.issn | 0196-8904 | |
dc.identifier.uri | http://hdl.handle.net/10259/4696 | |
dc.description.abstract | Two complete years of operation of two grid-tied PV facilities is presented. Energetic and economic performance of both installations has been compared. Located in the same place, the installation of these facilities followed the same construction criteria – PV panels, panel support system and wiring – and the facilities are exposed to the same atmospheric temperature and solar radiation. They differ with regard to their inverter topology used: one facility uses a central inverter and the other a string inverter configuration. The performance of the facilities has been determined using a procedure based on a small number of easily obtained parameters and the knowledge of the analyzed system and its operation mode. Electrical losses have been calculated for both systems and a complete comparison between them has been carried out. The results have shown better performance for distributed system in economic and energetic terms. | en |
dc.description.sponsorship | Spanish Government (Grant ENE2011-27511) and the Department of Culture and Education of the Regional Government of Castilla y León, Spain (Grant BU358A12-2). | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | eng | es |
dc.publisher | Elsevier | en |
dc.relation.ispartof | Energy Conversion and Management. 2014, V. 86, p. 1128-1133 | en |
dc.rights | Attribution-NonCommercial-NoDerivatives 4.0 International | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Inverter layout | en |
dc.subject | PV system | en |
dc.subject | Performance | en |
dc.subject | Grid-connected system | en |
dc.subject.other | Electrical engineering | en |
dc.subject.other | Electrotecnia | es |
dc.title | Performance of grid-tied PV facilities based on real data in Spain: Central inverter versus string system | en |
dc.type | info:eu-repo/semantics/article | |
dc.rights.accessRights | info:eu-repo/semantics/openAccess | |
dc.relation.publisherversion | https://doi.org/10.1016/j.enconman.2014.06.087 | |
dc.identifier.doi | 10.1016/j.enconman.2014.06.087 | |
dc.relation.projectID | info:eu-repo/grantAgreement/MINECO/ENE2011-27511 | |
dc.relation.projectID | info:eu-repo/grantAgreement/JCyL/BU358A12-2 | |
dc.type.hasVersion | info:eu-repo/semantics/acceptedVersion | en |