Mostrar el registro sencillo del ítem

dc.contributor.authorDiez Mediavilla, Montserrat 
dc.contributor.authorDieste Velasco, Mª Isabel 
dc.contributor.authorRodríguez Amigo, María del Carmen 
dc.contributor.authorGarcía Calderón, Teófilo 
dc.contributor.authorAlonso Tristán, Cristina 
dc.date.accessioned2018-01-11T09:13:46Z
dc.date.available2018-01-11T09:13:46Z
dc.date.issued2014-10
dc.identifier.issn0196-8904
dc.identifier.urihttp://hdl.handle.net/10259/4696
dc.description.abstractTwo complete years of operation of two grid-tied PV facilities is presented. Energetic and economic performance of both installations has been compared. Located in the same place, the installation of these facilities followed the same construction criteria – PV panels, panel support system and wiring – and the facilities are exposed to the same atmospheric temperature and solar radiation. They differ with regard to their inverter topology used: one facility uses a central inverter and the other a string inverter configuration. The performance of the facilities has been determined using a procedure based on a small number of easily obtained parameters and the knowledge of the analyzed system and its operation mode. Electrical losses have been calculated for both systems and a complete comparison between them has been carried out. The results have shown better performance for distributed system in economic and energetic terms.en
dc.description.sponsorshipSpanish Government (Grant ENE2011-27511) and the Department of Culture and Education of the Regional Government of Castilla y León, Spain (Grant BU358A12-2).en
dc.format.mimetypeapplication/pdf
dc.language.isoenges
dc.publisherElsevieren
dc.relation.ispartofEnergy Conversion and Management. 2014, V. 86, p. 1128-1133en
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 International
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectInverter layouten
dc.subjectPV systemen
dc.subjectPerformanceen
dc.subjectGrid-connected systemen
dc.subject.otherElectric engineeringen
dc.subject.otherIngeniería eléctricaes
dc.titlePerformance of grid-tied PV facilities based on real data in Spain: Central inverter versus string systemen
dc.typeinfo:eu-repo/semantics/article
dc.rights.accessRightsinfo:eu-repo/semantics/openAccess
dc.relation.publisherversionhttps://doi.org/10.1016/j.enconman.2014.06.087
dc.identifier.doi10.1016/j.enconman.2014.06.087
dc.relation.projectIDinfo:eu-repo/grantAgreement/MINECO/ENE2011-27511
dc.relation.projectIDinfo:eu-repo/grantAgreement/JCyL/BU358A12-2
dc.type.hasVersioninfo:eu-repo/semantics/acceptedVersionen


Ficheros en este ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem